Skip to main content

Band Heaters :

Band Heaters :
They consist of Ni-chrome or other resistance wires mica or ceramic insulated,  then encased in steel cover.
           *Mica insulated*
1. Flexible, supplied as a single piece.
2. Can withstand a load of 23-31 KW/m2
3. Shorter service life
4. Less expensive
           *Ceramic insulated*
1. Rigid,  supplied in 2 halves.
2. Can withstand higher heating load
3. Better services life
4. More costly

Popular posts from this blog

Breaker Plate & Screen Pack :

Breaker Plate - 1. This is performed metal disk,  with a multitude of small diameter holes. 2. The breaker plate is placed in between the screw and the die assembly. 3. It's principal function is to provide support for the screen pack . 4. The breaker plate helps also to convert the spiral flow of the polymer melts leaving the screw into a linear, axial one. Screen Pack - 1. Screen Pack is usually a multilayered,  nearly symmetrical sandwich of metallic wire screens.  2. It is placed between the screw and the breaker plate,  using the latter for physical support. It's  role is to eliminate the particulate contaminants.  3. The screen pack composition is always based on trade-offs, there is need to eliminate particulates using screens with high mesh,  but at the same time this create flow restriction,  it reduced the throughput, thus low mesh would be preferred.  4. Decision should be made as for as the maximum tolerabl...

Plunger-Plunger injection Moulding Machine

√ As the plastic industry developed a second type plunger machine appeared. known as two stage plunger. √ This type of equipment involved two plunger units set on top of other the one to plasticize the material and feed it to another cylinder that consist of a chamber to heat the plastic material by conduction and plunger that operates as a shooting plunger and push the plasticize material into the mould. Advantages    • Faster than conventional machine (single plunger) .  • No Pressure loss encountered in compacting the granules.   • Allows larger parts with more projected area. Disadvantage :  • Extra construction for pre plasticizing so cost is more.